Dump Truck Body Removal and Remount

Bid Date


Funding Source

January 25, 2024No bids received.Local

Ravenwood Drive Box Culvert Replacement

This project will remove the existing drainage structure crossing Ravenwood Drive and replace it with 160 lineal feet of 7’ X 3’ precast concrete box culvert, full height wing walls, along with minimal roadway work. 

Bid Date


Funding Source

February 8, 2024Bid ResultsLocal

Awarded to


Awarded Amount

R.B. Jergens Contractors, Inc.
$349,601.67

2024 Asphalt Emulsion, Fog Seal, and Aggregate

Bid Date


Funding Source

February 29, 2024Bid ResultsLocal

Holiday Drive ARPA Project

This is an American Rescue Plan Act (ARPA) Project for the purpose of replacing and improving a storm sewer collection system within Holiday Drive and Capri Circle in the East Lawn Heights Subdivision in Springfield Township, Clark County.

Bid Date


Funding Source

March 26, 2024Bid ResultsARPA

Awarded to


Awarded Amount




2024 Pavement Marking Contract

This is a cooperative bid by the Clark County Engineer, including other governmental jurisdictions located in Clark County, Ohio, for the purpose of providing re-tracement pavement markings in the form of edge line, centerline and lane line in various locations within Clark County.

Bid Date


Funding Source

2024Bid ResultsLocal

Awarded to


Awarded Amount




2024 Resurfacing Contract

This is a cooperative bid by the Clark County Engineer, including other governmental jurisdictions located in Clark County, Ohio, for the purpose of constructing an asphalt overlay of Item 441 Asphalt Concrete Type 1 (448) PG 64-22 for various Township, City, and Village roads, along with miscellaneous pavement repairs, milling, and other paving incidentals.

Bid Date


Funding Source

2024Bid ResultsLocal

Awarded to


Awarded Amount




Knollwood Road Bridge No. 246 Replacement PID 111832

The proposed project includes plans for the replacement of Knollwood Road Bridge No. 246 situated on County Route 325 in Clark County.  The project length is approximately 0.1 miles. The current bridge consists of a 90-foot-long steel pony truss on concrete abutments and spans Chapman Creek in the northern portion of the county. The bridge was constructed in 1987.  Local funds will be used for design services, and state funds will be used for construction.  Clark County will administer the consultant contract and construction.

Bid Date


Funding Source

2024Bid ResultsLocal

Awarded to


Awarded Amount




St. Paris Pike Bridge No. 231 - Furnish and Install

.

Bid Date


Funding Source

2024Bid ResultsLocal

Awarded to


Awarded Amount





Springfield Township - Holiday Drive Phase II

This is an American Rescue Plan Act (ARPA) Project for Springfield Township.

Bid Date


Funding Source

2024Bid ResultsARPA

Awarded to


Awarded Amount